Wednesday, January 21, 2009

Here's what we found under the bondo...
On some spot there was about 2 inches of bondo. Who ever did this job never bothered to shape the metal and just covered everything with close to 100 Lbs of bondo. Ken and I have never seeing this kind of work!
Ken is thinking to take the most cost effective route... shrinking the metal or fabricate new panels?











The right side